18禁无码AV免费不卡,成人a影片免费在线播放,亚洲AⅤ无码一区二区波多野,毛片基地a久久国产精品,午夜一级无码福利视频

Infrastructure Under-construction on PPP Basis – National Highway G206
ACEG Invest.  |  Updated: 2018-01-30  |  Views: 37285

The National Highway G206 Shucheng Section is with a length of 23.1KM starting from the Interchange Overpass named Shuqing in Shucheng County and ending at the boundary with County Tongcheng .

The designed speed is 80km/h for the main road with a width of 24.5m and 60km/h for the urban trunk road with a width of 32m.

The initial shareholder of this project is Tongyun Transportation Construction Investment Co., Ltd. in Shucheng County, accounting for 20% of the shares and the social capital - Anhui Construction Engineering Group Co., Ltd. accounting for 80% of the shares.

The total investment of the project is RMB 840 Million Yuan and the construction cost is RMB 688.5 Million Yuan. The total construction period is 18 months and the operation period is 10 years.

The project commenced in January 2017 and the scheduled completion date will be in July 2018.

 

天全县| 潜江市| 台州市| 曲麻莱县| 尚义县| 洞口县| 若羌县| 马龙县| 本溪市| 垦利县| 平潭县| 房山区| 泽州县| 洪雅县| 桓仁| 蒲江县| 军事| 陇南市| 宁南县| 遂昌县| 文成县| 克拉玛依市| 浑源县| 阜城县| 满洲里市| 康保县| 凤城市| 固安县| 工布江达县| 彰化市| 含山县| 海口市| 神农架林区| 陆河县| 巴南区| 遵义市| 噶尔县| 德钦县| 平昌县| 石城县| 女性|

<span id="py1xd"><listing id="py1xd"></listing></span>

    <label id="py1xd"><big id="py1xd"><tbody id="py1xd"></tbody></big></label>

  1. <li id="py1xd"></li>
    <rt id="py1xd"><delect id="py1xd"><style id="py1xd"></style></delect></rt><li id="py1xd"><legend id="py1xd"></legend></li>