18禁无码AV免费不卡,成人a影片免费在线播放,亚洲AⅤ无码一区二区波多野,毛片基地a久久国产精品,午夜一级无码福利视频

Localization building promotes great progresses
ACEG Pak. Br.  |  Updated: 2018-12-26  |  Views: 5166
For a period of time recently, ACEG Pakistani Branch staff members working for the project – Afghan Embassy in Pakistan, have worked overtime and overcome difficulties and tried to get closer to achieving their production targets.
 
In order to solve the problems of insufficient labor forces and differences in construction specifications and standards, the Project has vigorously promoted local contents in three aspects - labor localization; management localization and system localization and the work efficiency has been greatly improved as a result.
 
The Project has given full play to local labor advantages and employed a large number of skilled Pakistani workers and reduced the proportion of Chinese labors accordingly and hence the labor costs reduced. At present, the Project employs about 60 local workers, accounting for more than 80% of the total, among them, the steel reinforcing workers are all Pakistani workers. All the steel bar reinforcing works are all completed independently by the Pakistani workers.
 
Management localization plays key roles in the implementation of the Project for that American standards are adopted for the construction of the Embassy of Afghanistan in Pakistan and a large number of local workmen on the project site, and therefore the Project has recruited local engineers and technicians as well as management staff with rich experiences and gives full play to their advantages in language, culture, social relations and technologies.
 
At present, there are 9 Chinese and 10 Pakistani managing staff working for the civil engineering and installation of the Project and that the local engineers and technicians are accounting for more than 50%.
 
The Project has so far established and improved localized employee management system in combination with Pakistani labor law system and social culture, adopting double wage calculation method - equal pay for equal work and more work for more pay, which has stimulated the workers’ enthusiasm and encouraged them to improve their working efficiency. And the Project Manager has also strengthened humanistic cares for the local employees, he would for sure to visit the sick and hospitalized employees and participate in the employees’ wedding ceremonies and improve the welfare for the local employees, so that the local employees have enhanced their sense of belonging of the enterprise.
 
Localization building has created favorable conditions for the sustainable and healthy development of ACEG Pakistan Branch in the local market and the economic and social benefits and corporate brand image have all been boosted and localization building will be strengthened with the progress of the Project.
 
Safety education for the local employees
 
Local workers are tying up steel bars
 
 
Local workers are handling concrete placing
 
 
Chinese and Pakistani engineers are exploring technical issues
巴林左旗| 阳高县| 云阳县| 石景山区| 博湖县| 东辽县| 胶州市| 乌苏市| 贵州省| 伊宁市| 靖宇县| 浠水县| 平安县| 嘉禾县| 南雄市| 柯坪县| 阿勒泰市| 郯城县| 崇礼县| 赤城县| 盐池县| 无棣县| 崇州市| 石棉县| 扬中市| 三门峡市| 舟曲县| 宜州市| 广饶县| 伊川县| 仪陇县| 綦江县| 册亨县| 仁化县| 平谷区| 庆云县| 广饶县| 大城县| 南涧| 昌都县| 甘谷县|